Woodlands Farm, Beaconsfield

Client Lord Burnham Estates

Main Contractor Jarvis Contracting

This unusual project entails the demolition of an existing barn and the construction of a two storey commercial building for rent. As the site has a rural setting the building has been designed to give the feel of a farm house. It will also be extensively landscaped in a rural area, whilst still having easy transport links. The new building is the first of 3-phases on the site and will have an array of modern built-in features including; traditional strip foundations, steel frame with MMC internal walls, timber cladding, natural knapped flint, masonry and timber clad walls, pitch slated roof and air-source heat pumps. Due to the new buildings location on the site a Klagester biodegradable waste water treatment plant was installed to handle effluent water disposal.

 

European Space Agency, Didcott

Client ESA

Main Contractor Bouygues

We undertook the electrical installation for the new Telecommunications Centre for the European Space Agency.

The installation utilised a variety of modern building techniques, including incorporating the electrical installation within the solid concrete structure. Our expertise in design and coordination with other trades and services was essential in ensuring the project was delivered on time without compromise of quality and workmanship.

 

Boundary Way, Hemel Hempstead

Client Boultbee Brooks Real Estate

Main Contractor Jarvis Contracting

This existing 2 storey industrial unit was still suffering from damage sustained by the Buncefield disaster, before it underwent extensive alterations internally and externally to provide aircraft engineering facilities for the new tenant Goodrich.  Works to the double height warehouse included new extraction system, energy efficient lighting, new internal sprinkler valve room and 2 new external shutter doors with newly dug out loading/delivery bays. Governed by their United States insurance policy, an external sprinkler system was required.  

 

Park Royal, Wembley

Client Segro

Main Contractor Jarvis Contracting

This attractive design and build project comprised the demolition of the existing buildings and the erection of four high specification distribution warehouses and industrial buildings totalling 1800m2. The scheme was constructed to a very high standard for SEGRO PLC, property developers. The units benefit from excellent sustainability features such as solar thermal water heating, photovoltaic cells and rainwater harvesting.